Breakwater Visitor Centre, Anglesey
An existing building was extended to provide a new modern Visitor Centre. The old power supply, which was single phase, needed to be upgraded to 100-amp 3 phase. The challenges of the site meant that several hundred meters of cabling had to be installed requiring extensive trenchwork. The supply now met the requirements for the new load which included Car Charging points in the car park. Toilets, tea point, and an office were also included in the Design. Spaces were heated with Infra-red radiant panels and lighting was a mix of LED overhead panels and LED spotlights.